Poulfur School Window 4

Once again I have started with the outside panels.I have added the flowers to introduce a bit more color into the composition. The red and white represents the school sports colors as well as the local village Fethard -on- Sea’s colors.

There is one panel on the right hand side and the two panels are placed on the left of the central panel.

Here is the central panel no 15 under construction, there are a lot of curves in this panel which made it very labour intensive.

The central panel all cut and leaded and ready to be soldered at all the joints, followed by cementing. We now have all sixteen panels completed so its just a case of installing the frames and hoping everything lines up, Fingers crossed.