School Window Installation

Poulfur School Window Installation

Two Story Window
Two Story Window

With all the panels and the two frames completed it was finally time to install the piece.First job was to fix the two frames into the window recesses top and bottom. The frames were designed to fit flush up against the window exactly matching the existing frames.

Frames installed
Frames installed

Frames installed and first big sigh of relief, now it was time for the panels.

Panels 1 & 2 installed
Panels 1 & 2 installed

We decided to start at the top and work across and down, the top frame is actually six inches taller than the bottom frame.Here are the first two panels fitted, so far so good.

Panels 1,2 & 3 installed
Panels 1,2 & 3 installed 

This is panel no three installed, I think this is the largest panel so we were glad to see it in place.This concluded our first days work.